BSRIA Application Guide AG 3/89.3: Commissioning Air Systems. Application Procedures for Buildings
Parsloe C.J.
Now into its third edition, this guide covers the four major aspects of the commissioning process: design, installation, commissioning and documentation. These four areas are bound by the guidance given on the management of the process. The principal objective of commissioning management is to ensure that the division of responsibility at the interfaces of design with installation, and of installation with commissioning, is clearly understood and made explicit in the appropriate terms of engagement and conditions of contract.
Volume:
AG 3/89.3
Année:
2001
Edition:
3
Editeur::
BSRIA (Building Services Research and Information Association)
Langue:
english
Pages:
62
ISBN 10:
0860225917
ISBN 13:
9780860225911
Collection:
Application Guide
Fichier:
PDF, 2.60 MB
IPFS:
,
english, 2001